The track beyond the Snake River bridge. From here the line begins the long 1 in 25 to Oberon. (30-Mar-2002)
[Copyright: Kevin Sewell]

The track beyond the Snake River bridge. From here the line begins the
long 1 in 25 to Oberon.
Link