The signal control board at Ulan, controlling the entry and exit of trains from the Ulan Coal Loader balloon loop. (1999)
[Copyright: David Sweeney]
The signal control board at Ulan, controlling the entry and exit of trains from the Ulan Coal Loader balloon loop.
Link