Sorry, user registration is not yet available!

Olympic Park Line

Summary

Track: 1.74 km
Stations: 1 / 2 in use

The Olympic Park line was built to service the facilities for the Sydney 2000 Olympic Games. The line extends over the location of the old Abattoirs branch. All traces of this were removed with the Olympic line connecting to the network at the one-time site of Pippita Station. The line is double-track, forming a partly-underground balloon loop.

The station had its big test during the Olympic Games where it handled the passenger loads without any significant problems.


Name Facility Status Opened Closed km Photos
icon Pippita Station Closed 4-Oct-1940 20-Oct-1995 15.590 4
icon Olympic Park Station In Use 8-Mar-1998 - 17.330 7

Summary

Track: 1.74 km
Stations: 1 / 2 in use
Section Opened Closed Usage
Pippita - Olympic Park 1-May-1998     general