Jct (Start Boronia No 5 deviation) Jct (End Boronia No 5 deviation) |
Main facility: | Tunnel (Closed) | ||||
Lines: |
Main North Line |
||||
Location: | (151.2018°, -33.5522°) [exact] GDA94 | ||||
Distance: | unknown km from Sydney | ||||
History: |
|
||||
Photos: | 1980, 2007 | ||||
Description: | A 74m double-track tunnel that was bypassed in 1909as a result of improvements to curves during the duplication of the line. Although the bore is sufficient for double track use, only one track was ever laid. | ||||
Current status: | The tunnel is abandoned. |