Padulla |
Main facility: | Junction (Closed) | ||||
Lines: |
Main North Line |
||||
Location: | unknown [approx] GDA94 | ||||
Distance: | 240.310 km from Sydney | ||||
History: |
|
||||
Description: | A junction brought into use during the Singelton to Nundah deviation. Subsequently controlled the start of the double track section. | ||||
Current status: | Junction was removed when double track was extended from Singleton. |