Sorry, user registration is not yet available!

Boronia No 5 Tunnel

Main facility: Tunnel (Closed)
Lines: Main North Line
Location: (151.2018°, -33.5522°) [exact] GDA94
Distance: unknown km from Sydney
History:
7-Apr-1887 Opened
27-Jun-1909 Closed
Photos: 1980, 2007
Description: A 74m double-track tunnel that was bypassed in 1909as a result of improvements to curves during the duplication of the line. Although the bore is sufficient for double track use, only one track was ever laid.
Current status: The tunnel is abandoned.

1980 - 1980

photograph thumbnail  

2000 - 2010

photograph thumbnail