Main facility: | Tunnel (Closed) | ||||
Lines: |
Main North Line |
||||
Location: | (151.2298°, -33.5393°) [exact] GDA94 | ||||
Distance: | unknown km from Sydney | ||||
History: |
|
||||
Description: | A 149m double-track tunnel. The was replaced with the current tunnel when the track was re-align for the construction of the new Hawkesbury River bridge. | ||||
Current status: |